Skip to content

Pull requests: pingcap/tidb

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

ddl: fix the primary key in index is not in restored format (#53118) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#58000 opened Dec 5, 2024 by ti-chi-bot Loading…
1 of 13 tasks
ddl: fix the primary key in index is not in restored format (#53118) do-not-merge/cherry-pick-not-approved release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-7.1 This PR is cherry-picked to release-7.1 from a source PR.
#57999 opened Dec 5, 2024 by ti-chi-bot Loading…
1 of 13 tasks
lightning, ddl: set TS to engineMeta after ResetEngineSkipAllocTS needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#57998 opened Dec 5, 2024 by lance6716 Loading…
1 of 13 tasks
br: prompt k8s.io/api version (#57791) cherry-pick-approved Cherry pick PR approved by release team. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57988 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
backup: reset timeout on store level (#55526) cherry-pick-approved Cherry pick PR approved by release team. release-note-none Denotes a PR that doesn't merit a release note. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57987 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: fix br integration test file corruption (#56799) cherry-pick-approved Cherry pick PR approved by release team. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57986 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
br: avoid wrong warning (#56492) cherry-pick-approved Cherry pick PR approved by release team. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57985 opened Dec 4, 2024 by ti-chi-bot Loading…
2 of 13 tasks
br: restore checksum shouldn't rely on backup checksum (#56712) cherry-pick-approved Cherry pick PR approved by release team. ok-to-test Indicates a PR is ready to be tested. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57984 opened Dec 4, 2024 by ti-chi-bot Loading…
2 of 13 tasks
*: more log for bazel do-not-merge/needs-linked-issue do-not-merge/needs-tests-checked release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#57982 opened Dec 4, 2024 by hawkingrei Loading…
13 tasks
planner: add cascade basic interface definition and basic task type. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#57981 opened Dec 4, 2024 by AilinKid Loading…
1 of 13 tasks
executor: Enlarge the timeout for fetching TiFlash system tables (#57967) approved do-not-merge/cherry-pick-not-approved lgtm release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57979 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
executor: Enlarge the timeout for fetching TiFlash system tables (#57967) approved cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#57977 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
function: implement the oracle functions base on TiDB.[WIP] do-not-merge/cherry-pick-not-approved do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#57974 opened Dec 4, 2024 by joccau Loading…
13 tasks
planner: complete the memo/group-expression/group logic and add test for derive stats release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#57973 opened Dec 4, 2024 by AilinKid Loading…
1 of 13 tasks
executor: support anti semi join release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#57971 opened Dec 4, 2024 by xzhangxian1008 Loading…
3 of 13 tasks
statsitstics: avoid sync load column which is skiped type to analyze (#57144) approved cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-7.5 This PR is cherry-picked to release-7.5 from a source PR.
#57968 opened Dec 4, 2024 by ti-chi-bot Loading…
1 of 13 tasks
planner: fix incorrectly using the schema for plan cache release-note Denotes a PR that will be considered when it comes time to generate release notes. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#57964 opened Dec 4, 2024 by wjhuang2016 Loading…
1 of 13 tasks
session: add resource group name in stmt context (retrofit from 7.5 into 7.1) do-not-merge/cherry-pick-not-approved do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#57955 opened Dec 3, 2024 by romaninozemtsev Draft
12 tasks
statistics: limit the batch size when updating the stats cache needs-cherry-pick-release-8.5 Should cherry pick this PR to release-8.5 branch. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#57954 opened Dec 3, 2024 by winoros Loading…
1 of 13 tasks
dxf: merge loops in Run and RunStep of task executor release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#57944 opened Dec 3, 2024 by D3Hunter Loading…
1 of 13 tasks
function: support sysdate/systimestamp plus/minus num release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#57942 opened Dec 3, 2024 by joccau Loading…
3 of 13 tasks
executor: allocate handles on demand when build table tasks approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#57940 opened Dec 3, 2024 by zyguan Loading…
1 of 13 tasks
pingkai: add to_num function lgtm release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#57938 opened Dec 3, 2024 by GMHDBJD Loading…
1 of 13 tasks
sessionctx: fix null max value to leading wrong warning (#57898) do-not-merge/cherry-pick-not-approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.
#57935 opened Dec 3, 2024 by ti-chi-bot Loading…
1 of 13 tasks
sessionctx: fix null max value to leading wrong warning (#57898) cherry-pick-approved Cherry pick PR approved by release team. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. type/cherry-pick-for-release-8.1 This PR is cherry-picked to release-8.1 from a source PR.
#57934 opened Dec 3, 2024 by ti-chi-bot Loading…
1 of 13 tasks
ProTip! Filter pull requests by the default branch with base:master.